| Date |
Topic |
| 28.05.2015 |
CST Field Inspector GUI , AnalysisGui.C |
| 14.08.2014 |
Electrostatic model parameter |
| 24.07.2014 |
Attachment in T2K |
| 17.07.2014 |
Pulse time spectrum and photon converion in the small TPC |
| 10.04.2014 |
TPCDistortionsMap |
| 13.03.2014 |
Laser analysis |
| 13.02.2014 |
Update on the measurement of the drift velocity in laser test data |
| 06.02.2014 |
Latest results on the modules simulation, current measurements, photodot pattern reconstruction |
| 30.01.2014 |
Latest results on the modules simulation, CST interface performance, current measurements, GEM stack simulation |
| 19.12.2013 |
Final gas parameters T2K and laser data drift velocity & cluster finding |
| 12.12.2013 |
Different laser setups and gas parameters TDR/T2K |
| 28.11.2013 |
Time feature in laser data, Run summary 19363 B=0T, Run summary 19391 B=1T |
| 17.10.2013 |
Simulation of an ion gate |
| 14.08.2013 |
Summary of the measurements with the BigSky laser |
| 31.07.2013 |
Penning rate for Garfield++ simulations with T2K |
| 24.07.2013 |
Simulation of Laser events in the LP |
| 18.07.2013 |
Status of the laser data analysis/simulation |
| 16.05.2013 |
Comparison of standard CERN GEM measurements with measurements, wherea the top most GEM was replaced with one having larger holes |
| 02.05.2013 |
Almost complete set of ion feedback measurements |
| 25.04.2013 |
Update of XTC measurements |
| 18.04.2013 |
Summary of XTC measurements |
| 11.04.2013 |
Gain with misaligned GEM |
| 04.04.2013 |
Gain fluctuations |
| 28.03.2013 |
Triple GEM stack studies (Experiment/Simulation) |
| 14.02.2013 |
Current measurements with the Bonn chamber and Laser alternatives |
| 24.01.2013 |
Signal expectation in the module simulation |
| 20.12.2012 |
Update on current measurements |
| 06.12.2012 |
Corrected fields in the Garfield simulations |
| 29.11.2012 |
Update on Garfield simulations and the hardware project |
| 18.10.2012 |
Update on DESY module simulations |
| 02.08.2012 |
Measurements with the small tpc / Laser setup |
| 26.07.2012 |
Update on Garfield++ simulations |
| 28.06.2012 |
RD51 mini week review |
| 31.05.2012 |
DESY module: wire simulations |
| 26.04.2012 |
Preamplifier test results |
| 19.04.2012 |
Latest small tpc measurements |
| 05.04.2012 |
Garfield++ drift in vacuum |
| 22.03.2012 |
Fields in the induction/drift volume of Single GEM |
| 16.02.2012 |
Comparision of ANSYS and CST (grafield results), DESY modul simulation |
| 26.01.2012 |
Comparision of ANSYS and CST, DESY modul simulation |
| 05.01.2012 |
Mesh and drift lines for CST |
| 15.12.2011 |
Mesh and drift lines for ANSYS |
| 17.11.2011 |
Latest results for a Single GEM (CST) |
| 22.09.2011 |
Field Distortions Octopuse Chip, Field Distortions Octopuse Chip (grounded) |
| 18.08.2011 |
Drift plots |
| 11.08.2011 |
Garfield Interface |
| 28.07.2011 |
Garfield Studies |
| 07.07.2011 |
Spectra Features |
| 23.06.2011 |
First Results |