|
- Overview (15
pages)
- Introduction
- General Layout
- Machine Parameters and Luminosity
- Operation at Lower and Higher Energies
- Status of R&D (25
pages)
- Introduction
- Superconducting Cavities
- Integrated System Test
- Main Linac
(40 pages)
- Introduction
- Beam Dynamics
- Superstructure
- Accelerator Modules
- RF System
- Injection System
(30 pages)
- Introduction
- Electron Source
- Electron Pre-Accelerator
- Positron Source
- Positron Pre-Accelerator
- Damping Ring
(20 pages)
- Introduction
- Lattice Layout and Optics
- Beam Dynamics
- RF-System
- Injection and Extraction System
- Vacuum System
- Bunch Compressor and Beam Transfer to Main Linac (15 pages)
- Introduction
- Spin Rotator
- Compressor System
- Pre-Collimation and Diagnostic System
- Beam Delivery System
(25 pages)
- Introduction
- Magnet Lattice and Optics
- Luminosity Stabilisation
- Interaction Region and Beam-Beam Effects
- Collimation System
- Beam Extraction and Dump
- Optional Second Interaction Region
- Infrastructure and Auxiliary Systems (40
pages)
- Introduction
- Site Layout and Civil Construction
- Radiation Safety
- Power Distribution
- Water Cooling and Air Conditioning
- Installation and Alignment
- Cryogenic Plants
- Accelerator Module Test Facility
- Global Control System
- Free Electron Laser and its Sub-systems
(60 pages)
- Introduction
- TTF-FEL Operation Experience
- X-ray FEL User Requirements and Beam Parameters
- FEL and Linear Collider Integration
- Photocathode RF-Gun
- Bunch compressors
- Beam Transport and Distribution
- Radiators
- Project Management
(10 pages)
- Cost Estimate (10
pages)
|
last update:
March 29, 0000 |