- Nov. 1
- Mo cathode put back in the gun. Restart gun processing. Field not balanced in half and full cell.
- Nov. 2
- Mo cathode out. Cs
Te cathode #36 in.
- Dark current 210
A @ 2.2 MW(??) (11:23).
- Dark current 180
A @ 1.7 MW(35 MV/m) (18:50).
- Dark current 283
A @ ?? MW(37 MV/m) (19:00).
- Dark current measurement.
- Nov. 3
- Vacuum spikes in the gun.
- Dark current 48
A @ ?? MW(?? MV/m) (12:50).
- Nov. 4
- Dark current 53
A @ ?? MW(?? MV/m) (06:49).
- Dark current 50
A @ ?? MW(35 MV/m) (06:49).
- Nov. 5
- Dark current 106
A @ ?? MW(37.15 MV/m) (12:50).
- Nov. 9
- Dark current 75
A @ 1.8 MW(34.72 MV/m) (12:50).
- Nov. 10
- Dark current 62
A @ 1.8 MW(34.9 MV/m) (12:50).
- Nov. 12
- It has been found that the cathode is not inserted completely in the gun.
- Dark current 22
A @ 1.7 MW(35.3 MV/m) (17:10).
- Nov. 14
- Dark current 60
A @ 1.8 MW(35 MV/m) (07:39).
- Nov. 16
- Dark current 70
A @ 1.8 MW(35 MV/m) (07:19).
- Huntington manipulator is roughly 3 mm out from position for complete cathode insertion.
- Nov. 17
- Start inspection of the spring area. The cathode can hardly be inserted by hand.
The oval spring is removed. Round spring and old flange without nose are installed.
- Start pump down.
- Nov. 20
- Huntington X-ray.
- Mo cathode inserted in the gun. Start conditioning.
- TSPs fired.
- Mo dark current 90
A @ 1.9 MW (18:23).
- Mo dark current 110
A @ 2.0 MW (22:53).
- Nov. 21
- Mo dark current 106
A @ 2.0 MW (11:17).
- Mo cathode back (16:20).
- Cs
Te cathode (#36) back in the gun (18:00).
- Dark current 66
A @ 1.9 MW (21:19).
- Nov. 22
- Dark current 120
A @ 1.9 MW (06:43).
- Nov. 26
- Dark current 110
A @ 2.2 MW (20:00).
- Dark current measurement.
- Nov. 30
- Dark current 220
A @ 1.9 MW (12:56).
- Dark current 216
A @ 2.0 MW (15:54).