- Sept. 3
- Gun restarted with conditioning.
- Sept. 5
- Sept. 6
- Inserted old cathode #36 (01:00).
- Dark current 180
A @ 2.2 MW (04:40).
- Sept. 7
- Inserted Mo cathode for conditioning.
- Inserted Cs
Te cathode #36 (18:45).
- Sept. 8
- Dark current 650
A @ 2.2 MW (01:20).
- Dark current 300
A @ 2.2 MW (03:35).
- Sept. 9
- Dark current 248
A @ 2.2 MW (13:46).
- Sept. 11
- Dark current 200
A @ 2.2 MW (12:46).
- Dark current 200
A @ 2.2 MW (23:12).
- Sept. 13
- Dark current 202
A @ 2.2 MW (06:11).
- Sept. 16
- Dark current 260
A @ 2.2 MW (13:54).
- Sept. 20
- Dark current 268
A @ 2.2 MW (11:23).
- Sept. 21
- Cathode #36 out, Mo cathode in (16:30). Start gun conditioning.
- Sept. 28
- Due to increase in pressure in transport chamber, the carrier with the
cathodes has been moved in the main chamber after moving Mo cathode out from the
gun.
- Sept. 29
- CF16 viewport at transport chamber is leaking. Mo cathode removed from gun.
Cathodes moved in the main chamber. CF16 replaced with a blank flange.