Next: June '00
Up: 2000
Previous: March '00
  Contents
- Apr. 2
- Dark current 50
A @ 2.4 MW (07:31).
- Dark current 66
A @ 2.4 MW (evening).
- Apr. 5
- Dark current 103
A @ 2.4 MW (07:08).
- Dark current 110
A @ 2.4 MW (13:49).
- Dark current 154
A @ 2.4 MW (23:00).
- Apr. 6
- Dark current measurements. Dark current 194
A @ 2.4 MW (morning).
- Apr. 7
- Dark current 430
A @ 2.4 MW (15:52).
- Dark current 560
A @ 2.4 MW (20:30).
- Apr. 8
- Dark current 1.17 mA @ 2.4 MW (01:17).
- Dark current 0.8 mA @ 2.4 MW (07:00) after 20 minutes of gun stop.
- Dark current 1.85 mA @ 2.4 MW (18:39).
- Gun vacuum event. Valves had been closed.
- Dark current 0.97 mA @ 2.4 MW (23:30).
- Apr. 9
- Dark current 2.332 mA @ 2.4 MW (05:37).
- Dark current 6.2 mA @ 2.4 MW (21:11).
- Dark current measurements. Dark current 14.2 mA @ 2.4 MW (?????).
- Pump over night.
- Apr. 10
- Dark current measurements. Dark current 97
A @ 2.4 MW (10:44).
- Dark current 1.98 mA @ 2.4 MW (morning).
- Dark current measurements. Dark current 5.85 mA @ 2.4 MW (16:00).
- Cathode #21 removed.
- Cathode #23 inserted.
- Dark current measurements. Dark current 80
A @ 2.4 MW (17:57).
- Apr. 11
- Dark current 740
A @ 2.4 MW (02:15).
- Dark current 640
A @ 2.4 MW (08:05).
- Dark current 550
A @ 2.4 MW (15:45).
- cathode #23 out.
- Cathode #22 inserted (17:30).
- dark current measurements. Dark current 220
A @ 2.4 MW (17:40).
- Apr. 12
- Dark current 1.5 mA @ 2.4 MW (07:00).
- Cathode #22 removed and #23 inserted.
- Cathode chamber serie 3 installed.
- Gun restarted. Dark current 88
A @ 2.4 MW (12:00).
- Readjusted laser path to the cathode.
- Dark current 132
A @ 2.4 MW (17:45).
- Apr. 13
- Dark current 240
A @ 2.4 MW (13:45).
- Dark current 190
A @ 2.4 MW (21:00).
- Apr. 14
- Dark current 230
A @ 2.4 MW (07:32).
- Apr. 15
- Dark current 374
A @ 2.4 MW (06:07).
- Apr. 16
- Dark current 341
A @ 2.4 MW (16:00).
- Dark current 380
A @ 2.4 MW (23:00).
- Apr. 18
- Dark current 634
A @ 2.4 MW (07:09).
- Stop beam operation for roughly 6 hours.
- Dark current 430
A @ 2.4 MW (14:35).
- Dark current 710
A @ 2.4 MW (23:50).
- Apr. 19
- Dark current 970
A @ 2.4 MW (04:45).
- Stop beam operation at 5 o'clock.
- Dark current 1.13 mA @ 2.4 MW (07:19).
- Dark current 1.04 mA @ 2.4 MW (07:20).
- Dark current measurements. Dark current 900
A @ 2.4 MW (08:30).
- Cathode #23 retracted and TSPs fired (8:55).
- Cathodes exchanged. Taken #33 (10:00).
- Cathode closed to the gun.
- Cathode #33 inserted (12:00).
- Dark current 94
A @ 2.4 MW (12:15).
- Apr. 20
- Dark current 92
A @ 2.4 MW (10:30).
- Dark current 92.4
A @ 2.4 MW (15:30).
- Apr. 25
- Dark current 53
A @ 2.4 MW (08:30).
- Dark current 68
A @ 2.4 MW (23:15)
- Apr. 27
- Dark current 82
A @ 2.4 MW (03:56).
- SHUT DOWN.
Next: June '00
Up: 2000
Previous: March '00
  Contents
Daniele Sertore
2001-04-07