https://lists.desy.de/sympa/arc/ttf9ma
· Monday 15.12.2008
15:00 CET: TBC (24/200, WebEx)
· 09:12:08
John and Nick’s ~1 hour presentation to the FLASH Seminar (PPT)
· 07.11.08 Material from recent meetings / September run data analysis
·
Proposal for FLASH January 09 studies (PDF)
·
Submitted report on September studies (Carwardine, PDF)
·
04.11.08: Chris Adolphsen’s presentation
(September data analysis PPT)
·
28.10.08: Shilun Pei’s updated no-beam
analysis presentation (PDF)
·
14.10.08: Shin Michizono’s presentation op
beam energy analysis from September data (PPT)
·
14.10.08: Shilun Pei’s presentation on no-beam
LLRF data (PDF)
·
14.10.08: Stefan Simrock’s presentation on
upgrade options for ACC23 and ACC456 (PDF)
·
07.10.08: Nick Walker’s introduction to
meeting (PPT)
·
07.10.08: Siggi Schreiber’s presentation on
the status of FLASH dump vacuum (PPT)
·
07.10.08: John Carwardine’s summary of
accomplishments at September run (PPT)
· 17.09.08 Week 39 Shift Schedule (PDF)
· 17.09.08 Material from September 16 meeting:
·
Summary of LLRF machine study shifts (J. Carwardine,
PPT)
· 01.09.08 Material from August 26 meeting
·
Experience with running long bunch trains (L. Fröhlich PPT)
· 01.09.08 Material from August 12 meeting
·
LLRF Planning for September (Introduction) (N.
Walker PPT)
·
LLRF studies for September (J. Carwardine PDF)
· 06.08.08 Tentative shift plan for September accelerator studies (PDF) (detailed planned
to be published next week)
· 06.08.08 Material from general meeting 29.07.08
·
Summary of meeting (J. Carwardine, RTF)
·
September planning status (J. Carwardine, PDF)
·
Summary of LLRF meeting (Grecki/Simrock PDF)
· 15.07.08 Material from LLRF-focused WebEx meeting
·
Summary of meeting (J. Carwardine, PDF)
·
September planning (N. Walker, PPT)
·
9mA Studies at FLASH (M. Grecki, PDF)
·
Potential LLRF collaboration activities… (S.
Simrock, PPT)
· 18.07.08 Proposal for Work/Studies for September Shifts (J. Carwardine, RTF)
· 07.07.08 Slides presented to the BAC meeting held on 07.07.08 (part of
Katja’s presentation on plans) (PPT)
·
01.07.08
general meeting presentations
·
Experiment
status and update (N. Walker, PPT)
·
FLASH
9mA Studies Program: Proposed LLRF related studies (J. Carwardine, PDF)
·
SIMCON-DSP
proposal for ACC456 (S. Simrock, PDF)
·
23.06.08:
Report from May accelerator studies period (PDF)
·
18.04.08:
Material from 18.04.08 meeting
·
top-level
goals and planning for machine study periods – Himel (PPT)
·
Status
discussions and questions - Walker (PPT)
·
Meeting
summary (WORD)
·
14.04.2008 LLRF requirements (use-case) document from S.
Simrock (MS WORD)
·
10.04.2008
Draft proposal electronically submitted for TTF accelerator study period
19.05-01.06 (PDF)
·
18.03.2008 High-power requirements for dump (email from M.
Schmitz)
·
27.02.2008
Walker/Himel presentation at preparation meeting (PPT)
·
21.05.08
LLRF for FLASH 9mA Studies [PDF]
·
11.06.08
FLASH 9mA beam studies: HLRF/LLRF integration (J. Carwardine) [PDF]
·
17.06.08
Status report on RF for FLASH 9mA Studies Program (J. Carwardine) [PDF]
·
19.06.08
FLASH 9mA Studies Program: RF Integration (J. Carwardine) [PDF]
·
23.06.08
Proposal for LLRF studies (S. Michizono)
[WORD]
·
next:
Tuesday 15.07.2008 at 15:00 (tentative: LLRF specific)
|
07.07.2008 |
FLASH BAC
meeting |
Present
proposal to BAC |
|
|
19.05-01.06.2008 |
Accelerator
Studies via bypass |
Initial
sub-systems test for experiment |
|
|
23-27.09.2008 |
Accelerator
Studies via bypass |
Further
sub-system tests with long bunch trains |
|
|
12.12.2008 |
FLASH seminar |
||
|
05-18.01.2009 |
Accelerator
Studies via bypass |
Further
sub-systems test as needed |
|
|
18-20.01.2009* |
Mini-workshop on 9mA experiments |
TBC: dates to be in conjunction with January machine shifts |
|
|
06-24.05.2009 |
Dedicated 9mA experiments |
|
|