ILC Positron Source Group

John, RAL-meeting

Detailed positron system designs and documentation are required for the ILC TDR by the end of 2009. The first meeting of the ILC Positron Source Group at Oxford has the following goal. It is proposed that the group meets three times per year, rotating Europe--Japan--America, to discuss the status, progress, and plans for the various positron system design and R&D activities. The charge of the group is given here.

John, RAL-meeting

The corresponding meeting chair will be named by the ILC positron regional GDE representatives: J. Clarke, M. Kuriki , and J. Sheppard. Nine topics have been categorized that should be discussed including the availability of resources, milestones, schedules, and impediments.

Further details about the goals and organization of this group are given in this talk.

First meeting at RAL, Sep 27-29, 2006:

Schedule and talks:

John, RAL-meeting

The first meeting took place at the Rutherford-Appleton Laboratory, Oxford, U.K. on September 27-29, 2006, organized by John Sheppard, Yuri Ivanyushenkov and Glyn Northing.

Agenda, talks and further information are linked from this webpage.

Results:

  • John Sheppard was elected as spokesman of the collaboration.

  • The outcome of the summary discussion is linked.

  • Further summaries from the topic leaders are linked from this page here.

  • Registration for the `ILC Positron Source group' email list:

    Please send to
    Majordomo@durham.ac.uk
    an email with
    subscribe ph-ilc-positronsource
    in the body (not in the subject). You will automatically be registered at the list and receive a confirmation email.

    Second meeting at IHEP, Beijing, Jan 31 -- Feb 2 (prior to the GDE meeting):

  • The meeting is organized by M. Kuriki (details are given here.)


  • Gudi Moortgat-Pick
    Last modified: 10-January-2007